Mimms Industrial - Gwinnett Village, Ga

Erosion control, clearing, demolition, grading, storm & underground utility for 213,800SF addition to industrial building.




  • DEMOLISHION OF 64,000 SF EXISTING WAREHOUSE BUILDING

  • 416,750 SF OF ASPHALT DEMOLITION

  • 43,115 SF OF CONCRETE DEMOLITION 

  • 25 LOADING DOCKS

  • 95 TRAILER PARKING SPACES

  • EXCAVATE FOR BIORETENTION POND WITH 320 LF. OF 6” PERFORATED PIPE

  • INSTALL 2,660 LF. OF STORM PIPE, RANGING FROM SIZE  18” TO 36”

  • INSTALL 280 LF. OF 6” PVC SEWER PIPE

  • INSTALL PUMP STATION

  • INSTALL 240 LF. OF 4” CLASS 51 DIP FOR DOMESTIC WATER LINE

  • INSTALL 40 LF. OF 6” DIP, 320 LF. OF 8” DIP, AND 1,660 LF. OF 10” DIP

  • INSTALL 1,850 SF. OF MODULAR WALLS