Lowes Of Braselton Village - Braselton, GA

Site Development of a 13-acre site for Future Lowes. Sitework to include erosion control, grading for 100,000 SF Lowes Store, Underground utility installation.

  • Storm Drain Installation: We installed 2,100 linear feet of storm drains, ranging in size from 10 inches to 30 inches, ensuring efficient stormwater management and preventing potential water accumulation throughout the site.

  • Sewer Pipe Installation: We laid 1,000 linear feet of sewer pipe, sized at 16 inches, to establish an effective and reliable wastewater management system that meets the needs of the development.

  • Oil/Water Separator Installation: We installed a 1,500-gallon oil/water separator to efficiently treat and filter stormwater runoff, removing contaminants and oil to ensure compliance with environmental regulations.

  • Water Line Installation: Our team installed 750 linear feet of water lines, sized at 2 inches, providing a steady and reliable water supply to the site to support daily operations.

  • Fire Line Installation: To enhance safety, we installed 2,800 linear feet of fire protection lines, sized between 6 inches and 8 inches, ensuring that the site is fully equipped with reliable fire suppression infrastructure.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page