West End Retail - Atlanta, GA

Site-work for a one-story retail development.

  • Building Demolition: We demolished an existing 8,276 square foot building, clearing the site for the new construction and ensuring all debris was properly removed.

  • Site Clearing and Grading: We cleared and graded a 1.5-acre site, preparing a level foundation for future development while ensuring proper drainage and soil stability.

  • Underground Detention System Installation: We installed a Stormtech MC3500 underground detention system, which helps manage stormwater runoff by capturing and storing excess water, reducing the risk of flooding on the property.

  • Storm Drainage Pipe Installation: We installed 525 linear feet of storm drainage pipe, ranging in size from 8” to 24”. This infrastructure ensures efficient water flow and reduces the likelihood of flooding.

  • Sewer Line Installation: We installed 322 linear feet of 6” sewer line, ensuring proper wastewater management and minimizing the risk of backflow or blockages.

  • Fire Line Installation: We installed 240 linear feet of 6” fire line, providing essential infrastructure for fire suppression systems to ensure the safety of the site.

  • Domestic Water Line Installation: We installed 240 linear feet of 1.5” domestic water line, ensuring a reliable water supply for the facility.Site-work for one-story commercial development

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page