Boxville Acworth Self Storage - Acworth GA

Site development of a 5 acre site for 70,000 SF Storage facility
Site-work includes erosion control, demolition and clearing, grading export of excess dirt offsite.

  • Storm Drainage System Installation: We installed 700 SQ FT. of storm lines ranging in size from 18 inches to 36 inches. This system was designed to effectively manage stormwater runoff, ensuring proper drainage and site sustainability.

  • Underground Detention Pond Construction: A 72-inch underground detention pond was constructed to provide critical stormwater management, reducing the impact of heavy rainfall and meeting all regulatory requirements.

  • Sanitary Sewer System Installation: Our team laid 1,300 LF of sewer lines, with sizes varying from 6 inches to 8 inches, ensuring a reliable and efficient wastewater management system for the development.

  • Water Line Installation: We installed 1,000 LF of water lines, sized at 1 inch, to provide a dependable water supply to the site and meet all operational needs.

  • Fire Protection Line Installation: To enhance site safety, we installed 1,400 LF of fire protection lines, sized between 6 inches and 8 inches, to support fire suppression systems effectively.


Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page