Positive Place Boys and Girls Club - Gainesville, GA
Demolition, site prep for a new teen center for the Gainesville Boys and Girls Club, along with installing an 1,800 SF new infiltration basin.
Demolition: We demolished the existing 13,400 SQ FT. Teen Center, clearing the site efficiently to make way for new infrastructure. This included the safe removal of debris and preparation of the area for construction.
Hydro-International First Defense Units Installation: We installed two Hydro-International First Defense Units, which are designed to capture and treat stormwater runoff, removing pollutants and ensuring compliance with environmental standards.
Infiltration Basin Installation: We constructed a new 1,800 SQ FT. infiltration basin, a critical feature for managing stormwater. This basin allows water to be absorbed into the ground, reducing surface runoff and helping to recharge groundwater supplies.