St. Ignatius - Sandy Springs, GA

Site-work included erosion control, demolition, clearing, grading, adding a shoring wall and utilities.

  • Exported 2,000 CY of excess material offsite. Installed engineered shoring system for excavation of basement walls.

  • Storm Drainage System: Installed 220 LF of strom pipe ranging in sizes 4" to 12". Installed Bayfiller #545 water quality unit. 9LF x 6 LF with 545 Bayfiller Cartridges designed to remove sediment, heavy metals, and phosphorus.

  • Sewer System: Installed 4" PVC sewer lines to the building.

  • Domestic Water: Installed 340 LF of 2" PVC water lines.

  • Fire Line: Installed 340 Lf of 4" of pipe to building.


Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page