The Lovett School Drive Way - Atlanta, GA

Site-work including Clearing, Demolition Grading and Drainage work for new Loop Road.

  • Asphalt and Concrete Demolition: We demolished 47,000 SQ FT. of asphalt and concrete, clearing the site for new construction and ensuring a smooth transition to the next phase of development.

  • Modular Wall Demolition: Our team demolished 1,140 LF of modular wall, preparing the site for further construction and allowing for the installation of new structural elements.

  • Existing Storm Drainage Demolition: We removed the existing storm drainage system, ensuring the site was ready for the installation of an updated system to meet current specifications and drainage needs.

  • Site Clearing and Preparation: We cleared 1.7 acres of land, preparing the site for new development. This included the export of excess fill dirt and excavation for a soil nail wall, ensuring proper foundation support and stability.

  • Fine Grading and Backfilling: We fine-graded the site and performed backfilling for curb installation, ensuring a level surface and proper drainage for the new curb system.

  • Storm Drainage Installation: We installed LF of storm drainage, ensuring efficient water management and reducing the risk of flooding on the property.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page