Site-work, including clearing, grading, blasting, for a new parking garage on campus.

  • Asphalt Demolition: We efficiently demolished 31,650 SQ FT. of asphalt, preparing the site for further construction and infrastructure installation.

  • Concrete Demolition: Our team also demolished 4,565 SQ FT. of concrete, ensuring a smooth transition for the new construction elements to be installed.

  • HDPE Storm Pipe Installation: We installed 340 LF of high-density polyethylene (HDPE) storm pipe, designed to effectively manage stormwater runoff and ensure long-lasting drainage solutions.

  • Class V RCP Pipe Installation: We installed 168 LF of 18-inch Class V reinforced concrete pipe (RCP), providing a reliable and durable solution for stormwater management.

  • Underground Detention System Installation: We installed 153 chambers of an underground detention system (Storm Capture), designed to manage and control stormwater runoff, reduce flooding risks, and comply with environmental standards.

  • Bioretention System Installation: Our team also installed a bioretention system, a sustainable solution designed to filter and treat stormwater, improving water quality and supporting environmental goals.

  • Sanitary Sewer Installation: We installed 380 LF of 8-inch ductile iron pipe (DIP) for sanitary sewer lines, ensuring an efficient and reliable wastewater management system for the site.

Project Gallery

OFFICE

1069 Industrial BLVD N, Dallas, GA 30132

​

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

​

Call: (770) 606-9555

Email: inquiries@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page