The Lovett School Parking Deck - Atlanta, GA

Site-work, including clearing, grading, blasting, for a new parking garage on campus.

  • Asphalt Demolition: We efficiently demolished 31,650 SQ FT. of asphalt, preparing the site for further construction and infrastructure installation.

  • Concrete Demolition: Our team also demolished 4,565 SQ FT. of concrete, ensuring a smooth transition for the new construction elements to be installed.

  • HDPE Storm Pipe Installation: We installed 340 LF of high-density polyethylene (HDPE) storm pipe, designed to effectively manage stormwater runoff and ensure long-lasting drainage solutions.

  • Class V RCP Pipe Installation: We installed 168 LF of 18-inch Class V reinforced concrete pipe (RCP), providing a reliable and durable solution for stormwater management.

  • Underground Detention System Installation: We installed 153 chambers of an underground detention system (Storm Capture), designed to manage and control stormwater runoff, reduce flooding risks, and comply with environmental standards.

  • Bioretention System Installation: Our team also installed a bioretention system, a sustainable solution designed to filter and treat stormwater, improving water quality and supporting environmental goals.

  • Sanitary Sewer Installation: We installed 380 LF of 8-inch ductile iron pipe (DIP) for sanitary sewer lines, ensuring an efficient and reliable wastewater management system for the site.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page