Cambridge Square - Brookhaven, GA

Redevelopment of existing retail shopping center. Construction of a New Publix

  • Building and Slab Demolition: We demolished 45,770 SQ FT. of building and slab, clearing the site for new construction and infrastructure installation.

  • Asphalt Demolition: Our team demolished 194,880 SQ FT. of asphalt, preparing the site for further development and ensuring a smooth transition for the next construction phases.

  • Grading and Dirt Work: We graded 2,355 CY of dirt to prepare the site for infrastructure installation, ensuring proper elevation and leveling for efficient drainage and construction.

  • Dirt Exporting: We exported 9,250 CY of dirt to maintain the required site grade and provide a clean, level foundation for future development.

  • Roof Drain Installation: We installed 860 LF of 10-inch HDPE pipe for roof drainage, ensuring that water is effectively managed and directed away from the building's foundation.

  • Storm Drainage System Installation: Our team installed various sizes of HDPE storm drain pipes to manage stormwater runoff efficiently:

    • 405 LF of 18-inch HDPE

    • 310 LF of 24-inch HDPE

    • 320 LF of 30-inch HDPE

    • 322 LF of 36-inch HDPE

    • 32 LF of 36-inch Class III RCP

  • Storm Structures Installation: We installed 14 storm structures to ensure optimal water flow and effective stormwater management.

  • Underground Detention System Installation: We installed a Stormtrap underground detention system, consisting of 154 pieces, to effectively control and manage stormwater runoff, reducing the risk of flooding and ensuring compliance with environmental standards.

  • Infiltration Line Installation: We completed the installation of an infiltration line to enhance the stormwater management system and support groundwater recharge.

  • Sanitary Sewer Installation: Our team installed 826 LF of PVC sanitary sewer piping, ensuring a reliable and efficient wastewater management system.

  • Grease Trap Installation: We installed four 1,500-gallon grease traps to treat waste from food operations, ensuring compliance with environmental and health regulations.

  • Water Line Installation: We installed 60 LF of copper type 'K' domestic water line to provide a reliable water supply to the site.

  • Fire Water Line Installation: To enhance safety, we installed 200 LF of fire water line, sized with 51 Class DIP, to support the site's fire suppression system and ensure proper emergency response capabilities.


Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page