Kroger (College Station) - Athens, GA
Redevelopment of existing retail shopping center housing a Kroger.
Asphalt Demolition: We successfully demolished 417,375 square feet of asphalt, preparing the site for further development and infrastructure installations.
Retail Space Demolition: Our team carried out the demolition of 183,173 square feet of retail space, clearing the area for new construction and enhancing site readiness for upcoming developments.
Storm Pipe Installation: We installed 4,718 linear feet of storm pipe, ensuring effective stormwater management and drainage to prevent flooding and maintain site sustainability.
Sanitary Sewer Pipe Installation: We installed 1,932 linear feet of sanitary sewer pipe to establish a reliable wastewater management system, improving site sanitation and functionality.
Underground Detention System Installation: We installed a Stormtech underground detention system to effectively manage and control stormwater runoff, reducing the risk of flooding and supporting environmental goals.
Water Quality Units Installation: We installed two Cascade water quality units, designed to treat stormwater runoff and ensure that contaminants are removed before discharge, maintaining compliance with environmental regulations.
Grease Trap Installation: We installed two 1,500-gallon grease traps to treat waste from food-related operations, ensuring compliance with health and environmental standards.
Oil/Water Separator Installation: To further enhance stormwater quality, we installed one Stormceptor oil/water separator, effectively removing oil and contaminants from stormwater runoff before discharge.