top of page

Dahlonega Village - Dahlonega, GA

Site prep and grading for 48,387 sf. Publix grocery store with 8,000 sf. of additional retail space and 8,000 sf. of restaurant space.

  • Storm Drain Installation: We installed 2,312 linear feet of storm drain pipe, ranging in size from 18" to 48", ensuring efficient stormwater management and drainage to reduce flooding and maintain site stability.

  • Sewer Pipe Installation: Our team installed 1,631 linear feet of sewer pipe, ranging from 4" to 8", to establish a reliable wastewater management system across the site, ensuring proper sanitation and compliance with all regulations.

  • Grease Trap Installation: We installed 10 units of 1,500-gallon grease traps to treat waste from food-related operations, ensuring compliance with environmental regulations and preventing blockages in the sewage system.

  • Water Line Installation: We laid 620 linear feet of water line, ranging from 2" to 2 ½", providing a consistent and reliable water supply to meet the needs of the site.

  • Fire Line Installation: We installed 2,420 linear feet of fire line, ranging from 6" to 8", ensuring that the fire suppression system on site is equipped to handle emergency situations, providing safety and protection for all.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page