108 Townpark Apartments - Kennesaw, GA

Site development for a 3.5-acre apartment project near Kennesaw State University, including erosion control, demolition, grading, and utilities.

  • Importation of Fill Dirt: Successfully transported and placed 25,000 CY of fill dirt, ensuring the site met required elevation and grading specifications.

  • Storm Drainage System Installation: Installed 1,000 LF of storm drainage piping ranging in size from 10 inches to 36 inches, designed to effectively manage runoff and prevent water accumulation.

  • Underground Detention System: Constructed a 72-inch underground detention pond extending 1,000 linear feet. This system is crucial for managing stormwater, improving site sustainability, and meeting regulatory requirements.

  • Water Quality Units: Installed three Hydro International water quality units to enhance stormwater treatment and ensure compliance with environmental standards.

  • Sanitary Sewer Line Installation: Laid 950 LF of sanitary sewer lines, sized between 6 inches and 8 inches, to provide reliable wastewater management for the development.

  • Water Supply Line Installation: Installed 200 LF of water supply piping, sized at 4 inches, to ensure a steady and reliable water source for the site.

  • Fire Line Installation: Completed 1,200 LF of fire protection lines, with sizes ranging from 6 inches to 8 inches, to support fire suppression systems and enhance safety measures.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page